Commercial
The first of our many refurbishments for a valued client in the self-storage sector. We transformed a tired, dilapidated site into a modern facility built for long-term use.
A snapshot of the deliverables and value we brought to the project.
1 unit refurbishment to repurpose existing industrial building for self-storage.
Strip internals of building including mechanical items and mezanine floor.
Removal of existing wall and roof system, replaced with new composite panels.
Design, supply and install of new curtain walling including glazed cantilevered glass canopy and sliding doors.
Design, supply and install of new 200mm polished concrete slab to hold new multi-story mezzanine.
Construction of new lift pits to accommodate two new lift shafts.




Speak to the team to understand how FGA Group can support your steel-framed building or refurbishment requirements.